Construction of San Shek Wan Sewage Treatment Works, Associated Submarine Outfall and Pui O Sewerage Works

Construction of a secondary sewage treatment works (STW) at San Shek Wan in South Lantau and about 1.4 km long submarine outfall.

Project Name:

Construction of San Shek Wan Sewage Treatment Works, Associated Submarine Outfall and Pui O Sewerage Works

Project Description:
  1. Construction of a secondary sewage treatment works (STW) at San Shek Wan in South Lantau and about 1.4 km long submarine outfall;
  2. Construction of a sewage pumping station (SPS) at Pui O; 
  3. Construction of about 4.1 km of gravity sewers with diameters ranging from 150 mm to 375 mm along South Lantau Road and Chi Ma Wan Road and at Pui O Lo Uk ;
  4. Construction of about 1.2 km of twin rising mains with a diameter of 200 mm along South Lantau Road and Chi Ma Wan Road; and
  5. Ancillary works.

Our Scope

1. Design Authoring
2. Design Reviews
3. 3D Coordination
4. Cost Estimation
5. Engineering Analysis
6. Sustainability Evaluation
7. Phase Planning (4D Modelling)
8. Digital Fabrication
9. Site Utilization Planning
10. 3D Control and Planning
11. As-built BIM Modelling
12. Maintenance Scheduling
13. Asset Management
14. Drawing Generation (Drawing Production)

Contractor

Chun Wo – Kwan Lee Joint Venture

BIM Consultant

MES Asia Sdn Bhd

Commencement

March 2021

Book Your Free Demo

Ready to make your projects smarter, greener, and more efficient? Submit the form below, and we’ll be in touch!

Schedule Your Free Consultation

Ready to make your projects smarter, greener, and more efficient? Submit the form below, and we’ll be in touch!

Book Your Free Demo

Ready to make your projects smarter, greener, and more efficient? Submit the form below, and we’ll be in touch!