Advance Site Formation and Engineering Infrastructure Works at Kwu Tung North and Fanling North New Development Area

The works mainly comprise site formation of land under the First Phase of Fanling North New Development Area; and construction of engineering infrastructures including drainage and sewerage works, waterworks, roadworks (including carriageway, footpaths and cycle tracks), noise barrier works, slope works and landscaping works.

Project Name:

Advance Site Formation and Engineering Infrastructure Works at Kwu Tung North and Fanling North New Development Area

Project Description:

The works mainly comprise site formation of land under the First Phase of Fanling North New Development Area; and construction of engineering infrastructures including drainage and sewerage works, waterworks, roadworks (including carriageway, footpaths and cycle tracks), noise barrier works, slope works and landscaping works.

Our Scope

1. Design Authoring
2. Design Reviews
3. 3D Coordination
4. Cost Estimation
5. Engineering Analysis
6. Sustainability Evaluation
7. Phase Planning (4D Modelling)
8. Digital Fabrication
9. Site Utilization Planning
10. 3D Control and Planning
11. As-built BIM Modelling
12. Maintenance Scheduling
13. Asset Management
14. Drawing Generation (Drawing Production)

Contractor

China Road and Bridge Corporation

BIM Consultant

MES Asia Sdn Bhd

Commencement

31 Aug 2020

Book Your Free Demo

Ready to make your projects smarter, greener, and more efficient? Submit the form below, and we’ll be in touch!

Schedule Your Free Consultation

Ready to make your projects smarter, greener, and more efficient? Submit the form below, and we’ll be in touch!

Book Your Free Demo

Ready to make your projects smarter, greener, and more efficient? Submit the form below, and we’ll be in touch!